Day 100 – Contractor Returns

Posted: September 7, 2010 in Daily Progress

The contractor came back today to finish up a few things left on the punch list:

  • Fix the ice maker (needs a new valve in the basement where the ice maker water line taps into the cold water)
  • Put a coat of polyurethane inside the sink base.   This is because they redid the inside of the sink base with 1/4″ plywood to fix all the extra holes from moving the sink base several times to get it centered under the kitchen window
  • Fix the screws poking through the side of the pantry.  He backed the screws out, tapped the bumps down with a wood block and then touched up the color with a stain marker.    It’s not ideal but I think they finally wore us down!

Everything the contractor was supposed to do is now done, but just to be on the safe side,  we’re waiting a couple of days to see if the ice maker produces ice.